PU sandwich panel production line - the production line automation

 


1. First determine the time of the beat: no matter what kind of products, all must be completed in the right time to manufacture.
2. Unit process: only for a product, the unit parts handling, assembly, processing and material collection.
3. Pilot: Make a device that visually recognizes the beat time.
4. U-shaped production line: the equipment according to the order of the works counterclockwise, and one by one responsible for export and import.
5. AB control: only after the project without a product, and the former project has a product situation before the project.
6. A device that conveys a product in a process line.
7. After the project to receive: the production line of products to be due to the needs of the project.